Domestic sewage treatment plant – combined application for planning permission and a wastewater discharge permit
- a combined application for planning permission and a wastewater discharge permit
Where to apply:
Příbram Town Hall, Tyršova 108, 261 19 Příbram, Environment Department
Basic information:
A permit from the water authority is required for the construction of waterworks (domestic sewage treatment plants), for alterations to them and changes to their use, as well as for their removal.
Processing time:
Within 60 days; in particularly complex cases, within 90 days from the start of the proceedings.
Who is authorised to submit an application, notification, etc.:
The developer or their representative (under a power of attorney).
Other parties to the proceedings:
- the local authority,
- the watercourse manager (if the proceedings concern a watercourse),
- the river basin authority (if the decision may affect water conditions in the river basin),
- persons who hold ownership or other rights to the land and structures thereon, including persons who hold ownership or other rights to neighbouring land and structures thereon, and whose rights may be directly affected by the planning permission,
- or others, as appropriate.
Where to find the
form:
A printed copy of the application form can be obtained from the Department of the Environment and on the town’s website.
Download here:
Legislation governing the procedure:
- Act No. 500/2004 Coll., the Administrative Procedure Code
- Act No. 183/2006 Coll., on Spatial Planning and the Building Code (the Building Act)
- Act No. 254/2001 Coll., on Water
- Decree No. 183/2018 Coll., on the requirements for decisions and other measures of the water authority and on documents to be submitted to the water authority
- Act No. 634/2004 Coll., on Administrative Fees
Procedure under the Code of Administrative Procedure:
The permit is issued in administrative proceedings.
Requirements for the application:
See the relevant form.
Administrative (or other) fee:
- construction of a sewage treatment plant with a capacity of up to 50 population equivalents: 300 Kč
- construction of a sewage treatment plant with a capacity of more than 50 population equivalents: 3,000 CZK
- for the issue of a supplementary planning permission for a sewage treatment plant with a capacity of up to 50 population equivalents: 300 + 300 CZK, plus a fee for a site inspection – for each hour or part thereof during the administrative authority’s working hours: 500 CZK
- for the issue of an additional planning permission for a sewage treatment plant with a capacity of over 50 population equivalents: 3,000 + 3,000 CZK, plus a fee for an on-site inspection – for each hour or part thereof during the administrative authority’s working hours: 500 CZK
Remedies:
The proper remedy is an appeal. The decision issued contains instructions on how to appeal, specifying the time limit within which an appeal may be lodged, to which authority, and where the appeal may be lodged.
Responsible for the accuracy of these instructions: Ing. Miloš Dubovský