XNotification of completion of construction without a house number or registration number
Where to deal with this matter:
Building Control and Town Planning Department, Příbram Municipal Authority,
at the following address: Na Příkopech 105, Příbram I,
1st floor (on the right and left at the front of the building)
Basic information:
When carrying out construction work which required a planning permission or notification to the building authority, the developer is, amongst other things, obliged, in accordance with the provisions of Section 152(3)(d) of the Building Act, to notify the building authority of the stages of construction in accordance with the building inspection schedule, to allow for the inspection to be carried out, and, unless there are serious grounds preventing it, to attend this inspection.
Other necessary documents, information, etc.:
Completed notification form + other documents listed in point VI of the form
The form is available at the building authority, Na Příkopech 105, Příbram I,
or can be downloaded in PDF format here: NOTIFICATION OF COMPLETION OF CONSTRUCTION
Legislation governing the procedure:
Act No. 183/2006 Coll., on spatial planning and building regulations, the Building Act.
Decree No. 501/2006 Coll., on general requirements for land use.
Decree No. 503/2006 Coll., on more detailed provisions concerning spatial planning decisions, spatial planning measures and building regulations.
Decree No. 268/2009 Coll., on technical requirements for buildings.
Related legislation:
Act No. 500/2004 Coll., the Administrative Procedure Code.
Act No. 634/2004 Coll., on administrative fees.
Where to find further information:
On the building authority’s website – here
or by calling 318 402 461 – 471
Responsible for the accuracy of these instructions:
Ing. Petr Nováček – Building Authority officer