Pribram.eu O městě Ekonomika města Dotace a granty Dotace získané městem Operační program Životní prostředí 2007–2013 Implementation of energy-saving measures at the Jana Drdy 494 residential care home, Příbram VII
Zpět
Dot. získ. mě. Op. pr. Ži. p. Re. energe. ú.
Implementation of energy-saving measures at the Jana Drdy 494 residential care home, Příbram VII

| Project title | Implementation of energy-saving measures at the Jana Drdy 494 Social Care Home, Příbram VII |
| Operational Programme | Operational Programme: Environment |
| Brief description of the project | The aim of the project was to implement an energy-saving scheme at a care home, in accordance with the recommendations of an energy auditor. The project focused on improving the thermal performance of individual building elements (external wall insulation, bricking up of window reveals and their subsequent insulation). Furthermore, the single-layer roof and ceiling structures were insulated. The old metal windows and sheet metal doors at the top of the stairwell were replaced. The aim of the project was to reduce the building’s energy consumption – which had previously been inefficient in this respect – through the proposed energy-saving measures. The measures implemented resulted in the building achieving a low-energy or higher energy efficiency standard and a reduction in emissions. |
| Total expenditure on the project | CZK 2,691,803.20 |
| CZK 1,617,581.00 |
| CZK 1,074,222.20 |
| Total grant awarded from the OP Environment | CZK 1,445,822.90 |
| Co-financing from the city’s resources (including ineligible expenditure) | CZK 1,245,980.30 |
| Implementation period | July 2010 – October 2010 |
Press reports
- Renovation and thermal insulation of the care home is complete – PB Deník, 13 November 2010
- Costly thermal insulation will save schools millions of crowns a year – PB Deník 7 August 2010
- Příbram will continue with thermal insulation work this year too – PB Deník 13 January 2010
- Municipal buildings to be thermally insulated – Periskop 12 February 2010 (66.56 kB)
- The town has renovated a care home - MF Dnes 12 November 2010 (23.50 kB)
- Repairs to the care home cost over two million crowns – PB Deník 7 October 2010 (48.44 kB)
- Thermal insulation of municipal buildings continues – Periskop 26 August 2011 (79.70 kB)
- Energy savings achieved – DPS J. Drdy – Kahan, August 2010 (887.72 kB)
- Energy savings achieved – DPS J. Drdy – Kahan, February 2010 (857.08 kB)
- Energy savings achieved – DPS J. Drdy – Kahan, September 2010 (845.44 kB)
- Energy savings implementation – J. Drdy Retirement Home – Kahan September 2010 p. 2 (1,005.85 kB)
- Implementation of energy savings – DPS J. Drdy – Kahan December 2010 p. 2 (1,009.28 kB)
- Implementation of energy savings at DPS J. Drdy – press release – Kahan November 2010 (719.88 kB)
- From Příbram in brief – Periskop 19 November 2010 (235.26 kB)
- 75 million to be spent on thermal insulation – MF Dnes 13 August 2010 (23.50 kB)
- Thermal insulation for two care homes to be completed this year (235.89 kB)
- Thermal insulation will bring significant savings – Periskop 20 August 2010 (237.41 kB)
Press releases
Photographic documentation
- Care Home, Jana Drdy Street (11.91 MB)
- Photographic documentation – Commemorative plaque – J. Drdy Retirement Home (1.30 MB)
Updated: 28. 3. 2014 v 10:12:08
