Modernisation of the public lighting system in the town of Příbram – Phase IV – Nová Hospoda

| Project title | Modernisation of public lighting in the town of Příbram – Phase IV – Nová Hospoda |
| Registration number | 2182000744 |
| Programme | NATIONAL RECOVERY PLAN, component 2.2.2 |
| Brief description of the project | This project is co-financed by the European Union under the National Recovery Plan; the grant provider is the Ministry of Industry and Trade of the Czech Republic. The title of the application is ‘Modernisation of public lighting in the town of Příbram – Phase IV – Nová Hospoda”, application registration number 2182000744, under Call No. NPO 1/2022 ‘Reconstruction of Public Lighting’. Due to the unsatisfactory current condition of the public lighting, a complete reconstruction of the public lighting system was carried out, consisting of the replacement of luminaires. A total of 264 luminaires were replaced. The level of illumination or brightness of the road surface complies with the values required by the ČSN EN 13201 standard, with a deviation of no more than 30 per cent. No part of the luminous flux emitted by a luminaire is directed above the horizontal plane passing through the centre of the luminaire. Switchboards: The area is supplied by a total of 3 switchboards. The 3 switchboards in question were replaced. The switchboards were retrofitted with a control system. Street lighting structural elements: 67 street lighting columns were replaced, 9 columns were extended and 4 cantilevers were installed. The complete modernisation has therefore delivered energy savings of 75.28 per cent compared with the situation prior to the refurbishment, whilst also reducing light pollution. |
| Total expenditure on the project | CZK 6,212,012.95 incl. VAT |
| Total grant awarded | 3,278,470 CZK |
| Co-financing from the city’s resources (including ineligible expenditure) | CZK 2,933,542.95 |
| Implementation period | July 2024 – February 2025 |