Modernisation of the public lighting system in the town of Příbram – Phase IV – Nová Hospoda

 

 Project title  Modernisation of public lighting in the town of Příbram – Phase IV – Nová Hospoda                           
 Registration number                 2182000744
 Programme NATIONAL RECOVERY PLAN, component 2.2.2
 Brief description of the project 

This project is co-financed by the European Union under the National Recovery Plan; the grant provider is the Ministry of Industry and Trade of the Czech Republic. The title of the application is ‘Modernisation of public lighting in the town of Příbram – Phase IV – Nová Hospoda”, application registration number 2182000744, under Call No. NPO 1/2022 ‘Reconstruction of Public Lighting’. 

Due to the unsatisfactory current condition of the public lighting, a complete reconstruction of the public lighting system was carried out, consisting of the replacement of luminaires.

A total of 264 luminaires were replaced. The level of illumination or brightness of the road surface complies with the values required by the ČSN EN 13201 standard, with a deviation of no more than 30 per cent. No part of the luminous flux emitted by a luminaire is directed above the horizontal plane passing through the centre of the luminaire.

Switchboards: The area is supplied by a total of 3 switchboards. The 3 switchboards in question were replaced. The switchboards were retrofitted with a control system.

Street lighting structural elements: 67 street lighting columns were replaced, 9 columns were extended and 4 cantilevers were installed.

The complete modernisation has therefore delivered energy savings of 75.28 per cent compared with the situation prior to the refurbishment, whilst also reducing light pollution.

 Total expenditure on the project CZK 6,212,012.95 incl. VAT
 Total grant awarded 3,278,470 CZK
 Co-financing from the city’s resources (including ineligible expenditure) CZK 2,933,542.95
 Implementation period July 2024 – February 2025

Updated: 19. 8. 2024 v 11:36:43