Rehabilitation of the Květná landfill site

Logo Operačního programu Životní prostředí

Rekultivované území - Květná - situace po ukončení realizace projektu

Project titleRehabilitation of the Květná landfill site
Operational ProgrammeOperational Programme: Environment
Brief description of the projectAs part of the project, the landfill cells were shaped, technical containment barriers (an impermeable liner) were constructed across the landfill site, vegetation cover was established, drainage ditches were constructed to divert rainwater away from the landfill body, the pipework of the stream beneath the landfill body was inspected, and the leachate collection tank was inspected and cleaned. The aim of the project was to prevent the spread of pollution into the area surrounding the landfill body and to minimise the environmental impact in the vicinity of the landfill. The aim of the technical measures was to prevent the landfill body from being eroded by rainwater, to prevent leaching from the waste, and to eliminate the possibility of groundwater and surface water being contaminated by internal leachate.
Total expenditure on the project30,909,158.00 CZK
  • eligible expenditure
30,909,158.00 CZK
  • ineligible expenditure
CZK 0.00
Total grant awarded from the OP EnvironmentCZK 27,818,242.03
Co-financing from the city’s resources (including ineligible expenditure)3,090,915.97 Kč
Implementation periodJanuary 2012 – October 2012

Press reports

Photographic documentation

Updated: 28. 3. 2014 v 10:37:08