Implementation of energy-saving measures at the primary school in Březové Hory

| Project title | Implementation of energy-saving measures at the Primary School in Příbram – Březové Hory |
| Operational Programme | Operational Programme: Environment |
| Brief description of the project | The aim of the project was to implement energy-saving measures at the building in accordance with the recommendations of an energy auditor. The measures focused on improving the thermal performance of the individual building elements. External wall insulation was fitted, including the plinths; the loft ceiling was insulated; the roof of the annexe was insulated; and all windows and side doors were replaced. Glass blocks were replaced with windows, side entrance doors were replaced with insulated ones, and transom windows were replaced with insulated glazing. In the gym, all windows and the entrance doors were replaced, and the external walls and ground-floor plinths were insulated. The aim of the project was to reduce the building’s energy consumption – which had previously been inefficient in this respect – through the proposed energy-saving measures. The measures implemented resulted in the building achieving a low-energy or higher energy performance standard and a reduction in emissions. |
| Total expenditure on the project | CZK 13,859,392.50 |
| CZK 8,882,537.00 |
| CZK 4,976,855.50 |
| Total grant awarded from the OP Environment | CZK 7,994,283.30 |
| Co-financing from the town’s resources (including ineligible expenditure) | CZK 5,865,109.20 |
| Implementation period | December 2010 – December 2011 |
Press reports
- Příbram received a grant for a school – PB Deník, 24 March 2011
- Příbram to continue with thermal insulation work this year - PB Deník 13 January 2010
- Municipal buildings to be thermally insulated – Periskop 12 February 2010 (66.56 kB)
- Further grants for thermal insulation – Periskop 24 March 2011 (235.23 kB)
- Thermal insulation of municipal buildings continues – Periskop 26 August 2011 (79.70 kB)
- Příbram is planning a series of investments – PB deník 8 March 2010 (303.59 kB)
- Energy savings achieved – Březové Hory Primary School – Kahan, February 2010 (853.90 kB)
- Energy savings at Březové Hory Primary School – Kahan, April 2011 – p. 2 (1.08 MB)
- Implementation of energy-saving measures at Březové Hory Primary School – Kahan, May 2011, p. 10 (604.08 kB)
- Implementation of energy savings at Březové Hory Primary School – Kahan, November 2010, p. 2 (998.12 kB)
Photographic documentation
Updated: 27. 3. 2014 v 14:30:03