| Project name | Attic conversion at 28. října Primary School, Příbram VII |
| Operational Programme | Integrated Regional Operational Programme |
| Brief description of the project | The aim of the project is to construct new specialised classrooms for foreign languages, physics and multimedia (IT) in the existing and currently unused attic space beneath the roof of the primary school’s main building. The layout of the attic space is further complemented by staff rooms and circulation areas. Two new internal staircases will be constructed to provide access to the attic from the third floor. A newly designed passenger lift, situated on the outer face of the courtyard façade, will provide barrier-free access to all existing floors of the school, including the newly designed attic floor.
|
| Total expenditure on the project | 31,494,961.22 CZK |
| Total grant provided under the IROP | CZK 28,261,950.00 |
| Co-financing from the town’s resources (including ineligible expenditure) | CZK 3,233,011.22 |
| Completion of the project | June 2019 |
Press reports
- School to be extended with a loft conversion – MF Dnes 18 January 2017
- Schoolchildren in Příbram to get new classrooms – Příbramský deník, 23 January 2017
- School on 28. října Street to make use of attic space – Příbramský deník, 4 February 2017
- Příbram plans an attic conversion at the 28 October Primary School – www.pribram.cz 18 January 2017
- Příbram City Facebook page, 14 March 2018
- New classrooms and staff rooms to be built thanks to a grant – www.pribram.eu 14 March 2018
- Attic conversion at the primary school on 28. října Street – www.pribramsko.eu 14 March 2018
- New classrooms to be built in the loft conversion at the primary school on 28. října Street – www.pribram.cz 14 March 2018
- The town has secured a grant ... – Periskop 16 March 2018
- Preparations are underway for the loft conversion – Periskop May 2018
- Work begins on the loft conversion – Periskop 29 June 2018
- The loft conversion is confirmed; work has begun – Periskop 13 July 2018
- New classrooms from September – www.pribramsko.eu 22 July 2019
- New classrooms from September – www.pribram.cz 22 July 2019
- The school attic has been transformed into new classrooms following renovation – Příbramský deník 22 July 2019